How to write a CLIA plan of correction
A plan of correction (PoC) has to be acceptable to CMS in content and time frames. Here is a structure that addresses each finding and the system behind it.
Last reviewed Nov 24, 2026 · By the Sound Lab Consultants regulatory team
Book a free consultationWhat the rule requires
For deficiencies that are not at the condition level, "the laboratory must submit a plan of correction that is acceptable to CMS in content and time frames" (42 CFR 493.1816(a)). CMS may cancel Medicare approval if a lab "fails to submit a plan of correction satisfactory to CMS" or "fails to correct all its deficiencies within the time frames specified in the plan of correction" (493.1842(a)(2)).
A structure that works
- Correction of the instance: what was done for the specific records, patients or tests cited.
- Scope: how you checked for the same problem elsewhere, and what you found.
- Root cause: why the system allowed it.
- Systemic change: new or revised procedure, training, form, or role assignment.
- Monitoring: who checks, how often, and how results are reviewed.
- Responsible person and completion date for each item.
- Evidence: dated records that show it was done.
Credible allegation of compliance
Under 42 CFR 493.2, a credible allegation of compliance is a statement or documentation made by a representative of a lab with a history of maintaining a commitment to compliance and taking corrective action, that is realistic about what could be accomplished between the exit conference and the allegation, and that indicates the problem has been resolved.
Directed plan of correction
If condition-level deficiencies are found, CMS may instead impose a directed plan of correction, directing the lab "to take specific corrective action within specific time frames" (493.1832). See CLIA sanctions.
Frequently asked questions
What should a CLIA plan of correction include?
For each deficiency: the correction, how you checked scope, root cause, systemic change, monitoring, the responsible person, completion dates and evidence. It must be acceptable to CMS in content and time frames (42 CFR 493.1816).
What happens if a plan of correction is not acceptable?
CMS may cancel the lab's approval to receive Medicare payment if it fails to submit a plan of correction satisfactory to CMS (42 CFR 493.1842).